Watch this short video to see how The Generator Company carried out this project. 20 year old generators required replacing at Exchange House and therefore the renewal of backup generator capacity was required. It was decided that building’s infrastructure needed more resilience and therefore the generating capacity in the building needed to be improved, upgraded

Generator Upgrade for London Town Hall
165kVA Generator Upgrade Project Project Brief The Generator Company was required to provide a generator upgrade at this North London neoclassical...