Micro Case Study – Comprehensive power upgrade – NHS Facility

Micro Case Study – Comprehensive power upgrade – NHS Facility

MICRO CASE- STUDY MAJOR POWER UPGRADE – UK HEALTHCARE TRUST – A UK healthcare trust needed a full standby power upgrade to ensure backup protection in a critical care environment. The Generator Company (TGC) seamlessly replaced outdated HV & LV generators with MTU diesel generator sets, modern switchgear, and advanced fueling, cooling & attenuation systems

MICRO CASE- STUDY MAJOR POWER UPGRADE – UK HEALTHCARE TRUST – A UK healthcare trust needed a full standby power upgrade to ensure backup protection in a critical care environment. The Generator Company (TGC) seamlessly replaced outdated HV & LV generators with MTU diesel generator sets, modern switchgear, and advanced fueling, cooling & attenuation systems

Key Challenges & Solutions

Critical Uninterrupted Power:

Our inhouse hire facility provided 4×1250kVA temporary generators, fuel tanks & transformers, ensuring continuous hospital operations

Confined Space Work:

Heavy equipment removal & installation required precise planning and innovative solutions

Strict Noise & Emissions Control:

Custom exhaust silencing & catalytic converters reduced noise to 70dBA while meeting strict emissions standards

Complex / Remote Cooling & Fuel Systems:

Roof-mounted air blast coolers, fuel polishing systems and stainless-steel double-walled piping ensured optimal performance & reliability


Technical Highlights

HV Generators:

3×2500kVA/2000kW MTU diesel generators with advanced COMAP control systems and fuel management

LV Generator:

1×520kVA/416kW MTU diesel generator with local control panel and fuel management system

Exhaust & Noise Attenuation:

Twin-wall insulated stainless-steel flue systems, catalytic converters, and ventilation louvres for emission control and sound reduction

Fueling Systems:

High-capacity fuel tanks with integrated fire safety features and fuel polishing for reliability

Testing & Commissioning:

Black building and load bank testing ensured operational readiness and compliance

Conclusion

The project was successfully delivered on time, with no service disruptions, ensuring continuous critical care support. The advanced infrastructure implemented, guarantees long-term reliability and compliance with all appropriate regulatory standards. Additionally, the smooth transition from the old to new systems has significantly enhanced the hospital’s resilience. For expert power solutions, contact TGC today