Watch this short video to see how The Generator Company carried out this project. 20 year old generators required replacing at Exchange House and therefore the renewal of backup generator capacity was required. It was decided that building’s infrastructure needed more resilience and therefore the generating capacity in the building needed to be improved, upgraded
![Generator Installation at Remote Powerstations](https://www.tgc.uk.com/wp-content/uploads/2015/10/Case-Study-7471TGC-Falklands-2-250x141.gif)
Generator Installation at Remote Powerstations
Generator Installation at Remote Baseload Powerstation The Customer The customer required generator installation at 3 separate remote based power...