Generator Power System Upgrade at Grade II London Offices

Generator Power System Upgrade at Grade II London Offices

3 x 500kVA Generators Replaced During Modernisation of Mayfair Offices With extensive refurbishments taking place at grade II listed offices in Mayfair, London, The Generator Company were approached for the provision of an upgrade to the property’s existing back-up generator power system. This formidable Grade II listed property, was originally constructed between 1665 to 1673