Video: Renewal of Backup Generator Capacity at Exchange House

Video: Renewal of Backup Generator Capacity at Exchange House

Watch this short video to see how The Generator Company carried out this project. 20 year old generators required replacing at Exchange House and therefore the renewal of backup generator capacity was required. It was decided that building’s infrastructure needed more resilience and therefore the generating capacity in the building needed to be improved, upgraded

Main Contractor for New Standby Generators

Main Contractor for New Standby Generators

Main Contractor for New Standby Generators The Customer A leading development, investment and asset Management Company with a diverse portfolio in the UK, Europe, Australia and Asia, their latest UK office development is at Cheapside, in the City of London. The building comprises 17,000m² of office space spread over eight floors and a roof terrace

Alternator Rebuild at Power Station in Antigua Harbour

Alternator Rebuild at Power Station in Antigua Harbour

Alternator Rebuild at Power Station in Antigua harbour The Project   Following a tropical storm, the generator power station was flooded with approximately 450mm of water. The site engineers shut down the generator power station and switched off the main supply causing a complete power outage throughout the complex. The Generator Company responded to the

Replacement Petbow AP800 Generator Control Panel

Replacement Petbow AP800 Generator Control Panel

Replacement Petbow AP800 Generator Control Panel The Project The Generator Company were asked to design, manufacture, install and commission a replacement Petbow AP800 Generator Control Panel. Controls specification The control system was designed to operate with the 2 existing 1750kVA Generators which operate at 415Volts AC, 50 Hz, 3 phase and neutral. The Generator Company was

Standby Generator & Master Control Panel Installation

Standby Generator & Master Control Panel Installation

Standby Generator & Master Control Panel Installation The customer required The Generator Company to design, manufacture, deliver, install and commission a new Standby generator set plus associated plant. Our scope of works under this contract included: 1 x 1500 kVA PRIME rated ‘open’ Cummins generator set Acoustic container designed to achieve 75 dBA @ 1m and